go to top scroll for more

Projects


Projects: Projects for Investigator
Reference Number NIA_NGGT0014
Title Daily gas demand forecasting
Status Completed
Energy Categories Fossil Fuels: Oil Gas and Coal(Oil and Gas, Refining, transport and storage of oil and gas) 100%;
Research Types Applied Research and Development 100%
Science and Technology Fields PHYSICAL SCIENCES AND MATHEMATICS (Applied Mathematics) 100%
UKERC Cross Cutting Characterisation Not Cross-cutting 100%
Principal Investigator Project Contact
No email address given
National Grid Gas Transmission
Award Type Network Innovation Allowance
Funding Source Ofgem
Start Date 01 May 2011
End Date 01 September 2014
Duration 40 months
Total Grant Value £375,000
Industrial Sectors Technical Consultancy
Region London
Programme Network Innovation Allowance
 
Investigators Principal Investigator Project Contact , National Grid Gas Transmission (100.000%)
Web Site http://www.smarternetworks.org/project/NIA_NGGT0014
Objectives The Objective is to develop new methods for forecasting the daily gas demand from the National Transmission System. Project success would be the delivery of a new method to improve the demand forecasts that are provided to the market and to be used in operational decision-making.
Abstract National Grid Transmission forecasts the national gas demand for each day over a range of timescales, from a week ahead to within the day, and publishes forecasts to the gas market. This project investigates using local predictor techniques, which automatically identify similar days in history to the forecast day, to make a top-down forecast of total demand. This is a different approach to the fixed regression formula currently used, and initial tests have indicated a significant increase in accuracy over the current models. The Method is as follows: Develop initial day-ahead model and test as live trial Improve day-ahead model and further test as live trial. Report on model Continue support for live trials Refine local search for day ahead model and test as live trial Develop initial models for 5 to 2 days ahead, and test as live trial Enable implementation Further improve forecasts for 5 to 2 and day ahead, through emerging drivers and alternative modelsNote : Project Documents may be available via the ENA Smarter Networks Portal using the Website link above
Publications (none)
Final Report (none)
Added to Database 09/08/18